post

Mirror Lab

February 23, 2017 Wednesday – Steward Observatory Mirror Lab, University of Arizona, Tucson, AZ, USA

Both Reg and I drive the group into Tucson to visit the University of Arizona’s Mirror Lab. John and Garry have visited the lab before, but come along again since it is fascinating. For Reg, Diane, Matt and I, this is our first visit. This lab produces many of the world’s largest astronomical mirrors.

The Mirror Lab’s current multi-year project is to make the seven 8.4 metre mirrors for the Giant Magellan Telescope (GMT), which will be located at Las Campanas Observatory in Chile. Combined together, the seven mirrors will form a single parabolic surface some 24.5 metres (80’) across! GMT is scheduled to be operational in 2022 with four mirrors, and will be fully operational in 2024 with all seven mirrors. The first mirror is completed, and the second through fourth mirrors are currently in the process of being made.

The weather is wonderfully clear this evening, so Diane, Reg and I use the 25” telescope for visual observing from Garry’s observatory. My observing report

Leave a Reply

Your email address will not be published. Required fields are marked *